Integrate the systems.
Concealed HVAC required deliberate coordination between technical needs and architectural intent.
CreateCONSTRUCTIONA practical optometry facility with architecture that responds to the natural beauty of its site.

Bring the owner’s preference for warm, organic architecture into a functional clinical and retail setting.
Coordinate building systems and high-level finishes while navigating COVID-era market disruption.
Work with Cleary Zimmerman to identify, coordinate, and implement concealed HVAC systems within the design-build delivery.
Concealed HVAC required deliberate coordination between technical needs and architectural intent.
Connect the practical needs of an optometry facility with the character of the property.

An approximately 4,459-square-foot facility and 1.68 acres of site development, delivered under budget.